Artha WearTech Solutions

We serve

Empowering the manufacturing and resources industry with cost-effective, premium wear solutions that enhance safety, durability, and operational efficiency.

Cement Manufacturing

Boost equipment life with Acro materials that resist abrasion, heat, and chemical wear in harsh cement.

Open Cast Mining

Protect mining gear from extreme wear, ensuring durability and lower maintenance costs.

Power Plants

Enhance performance that combat corrosion, heat, and scaling in power generation equipment.

Steel Plant

Ensure clean, corrosion-resistant surfaces, meeting Steel Plant industry standards.

Testimonials

Listen from our customers

On how we have managed their assets, boost equipment efficiency, and streamline maintenance processes.

Solutions

Empowering the mining and resources industry with cost-effective, premium wear solutions that enhance safety, durability, and operational
efficiency.

interior-view-steel-factory

Enterprise asset management

Manage assets, boost equipment efficiency and, streamline maintenance processes.

Mask Group 22

Condition Monitoring

Centralized platform to reduce downtime for maintenance teams.

Mask Group 20

Request for Quote

Ask for a complimentary consultation to transform your manufacturing operations



    Mask Group 23

    Lubrication Management

    Organize lubrication management with detailed oil and grease product information

    safety-equipment-standard-construction-safety
    Mask Group 24

    Health Safety & Environmental

    All-in-one Safety Management for data-driven decisions and real-time insights.

    broken-bulldozer-issue
    Mask Group 25

    Field Service Management

    Consolidate client management, job tracking, and timekeeping in one powerful platform.

    CASE STUDIES

    Here are some of our projects that highlight our expertise in reducing operational costs and extending equipment lifespan for various industries.

    Metal Manufacture

    The new system prevented 66 potential failures, saving $165,000 in downtime, and $24,750 on equipment.

    Learn More…

    Lubrication Management

    Redlist significantly cut the time for inspections and data organization. Engineers saved 1 hour per inspection and reduced report preparation time by 25 to 80 hours.

    Learn More…

    Complete Lube Route Compliance Delivered

    Post-Redlist, the company has seen near-elimination of bearing failures and a significant boost in production—from 200 to 800 cubic meters daily.

    Learn More…

    Redlist Enhances Workforce Retention

    Post-Redlist, the company has seen near-elimination of bearing failures and a significant boost in production—from 200 to 800 cubic meters daily.

    Learn More…
  • Want to know more

    Reach us out to learn the most relevant case study for your requirements.

    Request a Call back